Siri Lodge, Down Place, Water Oakley, Windsor and Maidenhead, Berks
1890
This Eco house bordering the River Thames has achieved an excellent EPC of 94 through utilising ground source heating and cooling via under floor water pipe circulation through a two phase heat/cool pump. Solar PV panels on the roofs of the house and detached garage supply the electrical requirements through battery storage, and provide for EV charging.
Construction was completed in 2024.